It has been found that when a PBx-HMC is programed in OMNI with a Restart Day of "1", that it no longer communicates with the system until that value is changes.
Loss of power should not affect the controller, other than the obvious fact that the equipment will no longer be controlled during the power change over to generator. If the switch is quick enough, the SBC will not even notice it happened. Worst case ...