Can I have relays programmed to skip-a-day on alternating days?

Can I have relays programmed to skip-a-day on alternating days?

Yes. When you configure a relay to skip-a-day mode, the current day is the active day, and the next day will be the inactive day. To have relays offset, with one being active when the other is inactive, you will need to program the relays on separate days. For more information, see Modes and Configure Relay Modes in the user manual.
    • Related Articles

    • What does a restart day of 0 in a schedule do?

      When you set the restart day to 0, it means that the schedule will run through all the segments (days) and then it will stay on the final day and not restart. If you want to program a schedule for a single day and have it repeat forever both a ...
    • Can I replace the relays?

      Yes, if the revision of the backboard contains socketed relays, they can be replaced by purchasing the replaceable relays PKG-R52.
    • How do follower relays work?

      A follower relay mirrors the stage of the output that it is following. If it is following a relay, then it is on when the other relay is on, and off when it is off. If it is following a variable output, then it is off when the variable output is at 0 ...
    • Can I configure relays 2 and 3 for curtains?

      Yes. as long as they are beside each other, open being the first relay, close being the second relay.
    • How long is Analytics data stored?

      Analytics data is stored for 90 days. If you want to keep data older than this you can print to PDF or save as a CSV file.